Insulation Resistance Testing: Values and Limits
What 500 V DC proves, what it does not, and the reading that should stop a panel leaving the workshop.
202503-12
Continuity Testing Every Terminal
Point-to-point checking against the drawing catches the wire that was landed one terminal off. It takes hours and saves days.
202503-10
Powered Function Test Before Packing
Panel that has never been energised is a prototype. What a proper function test exercises and records.
202503-06
Hipot Testing: What It Can Damage
High potential testing is not a universal pass. Drives, surge arresters and electronics need to be isolated first.
202503-03
Photo Reports as Delivery Evidence
Dated photo of the wiring before the door closes settles arguments months later. What the report should show.
202503-01