First Article Inspection for a New Build
The first cabinet of a batch is the cheapest place to find a design error. What the inspection covers and who signs it.
202502-26
Handling Non-Conformance Without Delay
Raised non-conformance that waits a week for an answer costs more than the rework. Who decides, and how fast.
202502-22
Auditing a Subcontractor's Wiring
Outsourced assembly is fine until the labels and torque drift. The four checks that keep a second workshop honest.
202502-20
Component Traceability on a Cabinet
Which breaker went into which panel, and when. Traceability is a spreadsheet and a rule, not a software project.
202502-17
Closing a Punch List Before Shipment
Touching up paint and reprinting a label are small jobs that hold a container. The list and the sign-off that closes it.
202502-14
