Continuity Testing Every Terminal
Point-to-point continuity testing is the slowest test in the workshop and the one that catches the most errors. wire landed one terminal off will pass insulation, pass visual inspection and fail on site at the worst moment.
How it is done
Work from the drawing, not from the panel. For each circuit, confirm the two ends are connected, and confirm that neither is connected to anything else. tone generator and a probe are enough; a dedicated continuity tester with a numbered wand is faster on a large panel.
Where the errors are
Adjacent terminals on a dense block, two wires in the same ferrule, a wire that bypasses a terminal and lands directly on the device, and a spare that was supposed to be isolated but was landed anyway. All four are invisible after the duct cover goes on.
Recording
Tick each circuit on a printed drawing and sign the sheet. The tick marks are also a check that every circuit was actually tested rather than assumed. The insulation test note covers the other half of the electrical check, and the custom control panel is tested circuit by circuit with the ticked drawing filed against the serial number.
