About Us
A

About Us

About Us

Once a cabinet is installed it is hard to inspect: the busbar is behind a door, the terminal numbers are inside a duct, and the fault that appears six months later usually started at the bench. So the checks happen at four points during the build, and the results are written down.

Incoming inspection

Breakers, drives, contactors and terminal blocks are checked against the order list on arrival: model, rating, batch and quantity. Anything that does not match the approved list is held before it reaches a panel.

In-process checks

Wire ferrules, terminal torque and separation between power and control circuits are checked at the bench. The layout photograph taken at this stage goes into the order file.

Final electrical test

Point-to-point continuity against the wiring schedule, insulation resistance at 500 V, and an earth continuity check on the enclosure and door.

Functional test

The panel is powered and exercised against its sequence — drive run commands, pump rotation, damper outputs, alarm and trip paths. Where a PLC is fitted, the I/O is forced and verified point by point.

Certificates

Components are sourced with the certification they carry — CE or CCC as applicable to the model — and the declaration documents are passed on with the shipment where the supplier provides them. Where a project requires a specific standard for the assembly, tell us at quotation stage and we will confirm what can be documented.

Certificate 1
Certificate scan 1 — to be supplied
Certificate 2
Certificate scan 2 — to be supplied
Certificate 3
Certificate scan 3 — to be supplied
Certificate 4
Certificate scan 4 — to be supplied

What travels with the panel

  • Component list with brands and ratings
  • Wiring schedule and terminal numbering
  • Test sheet signed at final inspection
  • Photographs of the finished panel
  • Packing list for export shipments