Auditing a Subcontractor's Wiring
Outsourced assembly is normal and works well until the labels and the torque values drift. The difference between a good subcontractor and a bad one is rarely skill; it is documentation discipline.
The four checks
First, incoming panels are inspected for wiring against the drawing, not just for completeness. Second, torque marks are present on every terminal. Third, labels match the schedule, including the spare points. Fourth, the test sheet is filled in by the subcontractor and countersigned on receipt.
Sampling versus full inspection
Full inspection of every outsourced panel defeats the purpose of outsourcing. Sample the first three of a batch fully, then one in five, and go back to full inspection after any failure. The rule is written down so it does not depend on who is on shift.
Sharing the standard
Give the subcontractor the same drawing set, the same torque table and the same label specification used in-house. Most drift comes from ambiguity rather than carelessness. The torque note covers the marking convention, and the custom control panel work that is subcontracted is inspected to the same checklist as in-house builds.