First Article Inspection for a New Build
The first cabinet of a batch is the cheapest place to find a design error and the most expensive place to skip a check. Everything after it inherits whatever the first one got wrong.
What it covers
Full dimensional check against the drawing, complete wiring verification, function test, and a review of any deviation found during build. The customer is invited to approve it, either by visiting or by reviewing the photo report and test sheet. That approval is the point of the exercise.
Why it must be signed
first article that is approved informally will be argued about during the batch. signed approval, with the deviations listed, converts a future dispute into a documented decision. Where the customer cannot approve in time, the panel builder approves internally and states the assumption in writing.
Then what
Freeze the design: drawing revision, program version, component list. Changes after first article approval go through a documented change note, not through a verbal instruction on the shop floor. The non-conformance note covers what happens when a deviation appears mid-batch, and the custom control panel batches are built against an approved first article.