Loading a Container Without Crushing Cabinets
Loading a container of panels is a two-hour planning exercise that decides whether the cargo arrives straight. Weight distribution, bracing and the order of loading are all decided before the first case goes in.
Weight distribution
Heavy panels over the axles, not at the doors. container with 20 tonnes concentrated at one end flexes in a seaway, and the cases at the light end lift and settle. Aim for the centre of gravity within a metre of the container centre.
Bracing
Timber battens nailed to the floor lashing points, or airbags between cases. Cases must not be able to move in any direction, including upward. case that can lift 50 mm will drop 50 mm on every wave.
Order and access
Load the panels that will be unloaded last at the far end, and keep the documents case at the door. Where several drops are involved, the loading plan follows the delivery sequence. The forklift marking note covers what the stevedores need to see, and the custom control panel export loads are planned with a written loading diagram per container.
