Cooling Control for a Small Data Hall
Small data hall, 180 square metres, with a chilled water cooling system and a requirement that no single failure should raise the hall temperature above 27 °C before the operator responds.
Control philosophy
Two chilled water circuits with automatic changeover, three air handling units on variable speed, and a control panel that keeps running if either circuit fails. The panel was supplied with redundant 24 V supplies and a PLC on a UPS-backed circuit, not on the raw supply.
Alarms
Every alarm has a threshold, a delay and a destination. temperature alarm below 27 °C goes to the BMS log; above 27 °C it pages the duty engineer; above 30 °C it starts all fans at full speed regardless of the control signal. Alarm delays prevent a transient from waking anybody at night.
What was learned
The original design had no delay on the temperature alarm, and a defrost cycle on one unit produced a page every week until the delay was added. Alarm discipline matters as much as redundancy. The HVAC drive note covers the fan control, and the fan and HVAC control cabinet is built with the alarm philosophy implemented in the PLC rather than the BMS.
