Planning Cable Entries Before the Enclosure Is Ordered
Cable entry is decided in minutes at the quotation stage and lived with for the life of the panel. Getting it wrong shows up late: a gland that will not fit, a knockout that lands behind a DIN rail, a shielded cable with nowhere to bond its screen.
Decide the direction first
Bottom entry is the default for floor-standing cabinets in a plant room: cables arrive from a trench or a raised floor, water cannot run down into the enclosure, and the gland plate stays accessible. Top entry suits cabinets fed from overhead tray, and it needs a drip loop in every cable plus a hood over the entries, or rain and condensate follow the cable into the panel.
Side entry appears when the cabinet stands against a wall with no trench and no tray above. It works, but it puts the gland plate where the door swing and the wall clearance fight for the same space.
- Plant room with trench — bottom entry, gland plate across the full width.
- Overhead tray, indoor — top entry, sealed entries, drip loops formed on site.
- Outdoor or washdown — bottom entry only, with a drain/breather if the enclosure is sealed.
- Retrofit — leave a spare gland plate, not a spare hole.
Gland plate or knockout
Knockouts are cheap and permanent. Once a 32 mm knockout is punched, the position is fixed for the life of the enclosure, and a cable that arrives 40 mm to the left needs a second hole and a blanking plug in the first. Gland plates — a removable section of the base or top — let the entry pattern be drilled on the bench, before the cables arrive, and replaced if the layout changes.
On our cabinets the gland plate is 2 mm steel, bolted with a gasket, sized to the full internal width. It costs a little more than a plain base and it has saved more than one site visit.
How much spare capacity
Rule of thumb we use: plan the entries for the drawing, then add 25 to 30 per cent spare, and never fewer than three blank positions. Reasons the spare gets used:
- Field instruments added after commissioning — a pressure transmitter, a level switch, a remote reset.
- Signal cables replaced with shielded types, which are thicker at the gland.
- Separate earth conductor added for a drive, which cannot share a gland with power cores.
Spare capacity is cheap as a larger gland plate and expensive as a second field visit.
Sealing and strain relief
Every entry needs a gland rated for the cable and the environment. Three failures we see regularly:
- Gland sized to the cable's nominal diameter instead of its actual jacket. A 4-core 6 mm² cable measures differently in a flexible version and a rigid one.
- No strain relief, so the weight of a vertical cable run pulls on the terminal. Glands with a clamping insert solve it for a few cents each.
- Multiple cables through one gland. It is done on site, it destroys the IP rating, and it is invisible on the drawing.
Shielded cable and the EMC bond
Where a drive cable or an analogue signal enters the panel, the screen has to be bonded to the enclosure at the entry point, not at the terminal block. That means an EMC gland or a shielded clamp on a bare earth bar, with the screen exposed for 360 degrees of contact. Pigtailing the screen to a terminal provides a low-frequency path and almost nothing above a few MHz, which is exactly the range a drive generates.
Our VFD control cabinets are built with a separate EMC bar below the gland plate, so screened motor cables and signal cables each have their own bonding point and the power earth bar is not crowded with screens.
What to send with the enquiry
Cable schedule if one exists, the cable types and outside diameters, the entry direction, and the routing at site. Where the schedule is not ready, we draw the default pattern — bottom entry, three spares, EMC bar — and mark it on the approval drawing for comment. That drawing is the point at which a change is a pencil mark rather than a new door.