
Low-Voltage Power Distribution Cabinet
Distribution cabinets are built to the single-line diagram and the site cable schedule: main incoming breaker or changeover, metering, and the outgoing feeders your installation needs. Busbar is sized to the short-circuit rating and every joint is torque-checked before the doors go on.
- Type
- GGD fixed type, MNS / GCK withdrawable, or built to customer drawing
- Rated current
- Up to 3200 A
- Rated voltage
- 380 / 400 / 415 V, 50 / 60 Hz
Overview
Fixed GGD patterns suit workshops and plant rooms where the load list is stable. Withdrawable MNS or GCK patterns are used where a feeder has to be isolated without shutting the section down. Both are offered in powder-coated steel or 304 stainless where the atmosphere demands it.
Cable entry can be arranged from the top or the bottom, with removable gland plates so the installer is not fighting the enclosure on site. Neutral and earth bars are sized to the installation, not to the frame.
Build details
- Form of separation up to 3B / 4 on withdrawable designs
- Cable entry from top or bottom with removable gland plates
- Phase sequence and torque checked on every busbar joint
- Neutral and earth bars sized to the installation
- Circuit schedule engraved or printed on the door
Specifications
| Type | GGD fixed type, MNS / GCK withdrawable, or built to customer drawing |
|---|---|
| Rated current | Up to 3200 A |
| Rated voltage | 380 / 400 / 415 V, 50 / 60 Hz |
| Busbar | T2 copper, sleeved and sized to the short-circuit rating |
| Incoming | Main breaker, ATS or manual changeover as required |
| Outgoing | MCCB / MCB feeders, contactors, thermal overload relays |
| Metering | Ammeter, voltmeter, indicator lamps, multi-function meter |
| Enclosure | Powder-coated cold-rolled steel or 304 stainless steel, IP30 – IP54 |
Specifications vary with the motor list and the site supply. Tell us the load and the environment and we will confirm the build.
Typical applications
- Factory power distribution
- Workshop sub-mains
- Pump stations
- Commercial buildings
- Temporary power
- Generator changeover
